Resolution |
Revision |
Adoption Date |
Title |
Implementation Date |
UR S35 |
Corr.1 |
Sep. 2024 |
Buckling Strength Assessment of Ship Structural Elements |
--- |
UR Z1 |
Rev.10 |
Sep. 2024 |
Annual and intermediate classification survey coverage of IMO Resolution A.1186(33) |
--- |
UR M46 |
Rev.4 |
Aug. 2024 |
Ambient conditions – Inclinations and Ship Accelerations and Motions |
1 Jan. 2026 |
UR E10 |
Rev.10 |
Aug. 2024 |
Test Specification for Type Approval |
1 Jan. 2026 |
UR F44 |
Rev.3 |
Sep. 2024 |
Fore peak ballast tanks and space arrangements on oil & chemical tankers |
1 Jan. 2026 |
UR Z7.1 |
Rev.15 Corr.1 |
May 2024 |
Hull Surveys for General Dry Cargo Ships |
--- |
UR Z7 |
Rev.29 Corr.1 |
May 2024 |
Hull Classification Surveys |
--- |
UR S10 |
Rev.7 Corr.2 |
May 2024 |
Rudders, Sole Pieces and Rudder Horns |
--- |
UR C7 |
New |
May 2024 |
Approval and Certification of Container Securing Systems |
1 Jul. 2025 |
UR C6 |
New |
May 2024 |
Requirements for Lashing Software |
1 Jul. 2025 |
UR W8 |
Rev.4 |
Mar. 2024 |
Hull and machinery steel castings |
1 Jan. 2025 |
UR E21 |
Rev.2 |
Feb. 2024 |
Requirements for uninterruptible power system (UPS) units |
1 Jul. 2025 |
UR M61 |
Rev.3 |
Feb. 2024 |
Starting Arrangements of Internal Combustion Engines |
1 Jul. 2025 |
UR M84 |
New |
Feb. 2024 |
Capacity and availability of compressed air for essential services |
1 Jul. 2025 |
UR M47 |
Del. |
Feb. 2024 |
Bridge control of propulsion machinery for attended machinery spaces |
--- |
UR M43 |
Rev.1 |
Feb. 2024 |
Bridge control of propulsion machinery |
1 Jan. 2025 |
UR M3 |
Rev.7 |
Feb. 2024 |
Speed governor and overspeed protective device |
1 Jan. 2025 |
UR M78 |
Rev.2 |
Jan. 2024 |
Reciprocating Internal Combustion Engines Fuelled by Natural Gas |
1 Jan. 2025 |
UR G3 |
Rev.8 |
Oct. 2023 |
Liquefied gas cargo and process piping |
1 January 2025 |
UR H1 |
New |
Jan. 2024 |
Control of Ammonia releases in Ammonia fuelled vessels |
Jan. 2025 |
UR L2 |
Rev.3 |
Nov. 2023 |
Intact stability – matter of class |
1 Jan. 2025 |
UR F42 |
Del. |
Nov. 2023 |
Fire testing of flexible pipes |
--- |
UR E26 |
Rev.1 |
Nov. 2023 |
Cyber resilience of ships |
1 July 2024 |
UR W35 |
Rev.1 |
Oct. 2023 |
Requirements for NDT Service Suppliers |
1 Jan. 2025 |
UR G1 |
Rev.3 Corr.3 |
Sep. 2023 |
Vessels with cargo containment system for liquefied gas |
--- |
UR F15 |
Rev.7 |
Sep. 2023 |
Reinforced thickness of ballast and cargo oil piping |
1 January 2025 |
UR W27 |
Rev.3 |
Sep. 2023 |
Cast Steel Propellers |
1 Jan. 2025 |
UR W24 |
Rev.5 |
Sep. 2023 |
Cast Copper Alloy Propellers |
1 Jan. 2025 |
UR E27 |
Rev.1 |
Sep. 2023 |
Cyber resilience of on-board systems and equipment |
1 July 2024 |
UR M24 |
Rev.2 |
Aug. 2023 |
Requirements concerning use of crude oil or slops as fuel for tanker boilers |
1 January 2025 |
UR M61 |
Rev.2 |
Aug. 2023 |
Starting Arrangements of Internal Combustion Engines |
1 January 2025 |
UR E10 |
Rev.9 |
Aug. 2023 |
Test Specification for Type Approval |
1 July 2024 |
UR M46 |
Rev.3 |
Aug. 2023 |
Ambient conditions – Inclinations and Ship Accelerations and Motions |
1 January 2025 |
UR Z10.3 |
Rev.21 |
Aug. 2023 |
Hull Surveys of Chemical Tankers |
1 July 2024 |
UR M81 |
Rev. 1 |
July 2023 |
Safety measures against chemical treatment fluids used for exhaust gas cleaning systems and the residues which have hazardous properties |
1 July 2024 |
UR E22 |
Rev.3 |
June 2023 |
Computer-based systems |
1 July 2024 |
UR S10 |
Rev.7 Corr.1 |
Jun. 2023 |
Rudders, sole pieces and rudder horns |
--- |
UR S3 |
Rev.2 |
Jun. 2023 |
Strength of end bulkheads of superstructures and deckhouses |
1 Jul. 2024 |
UR A1 |
Rev.8 |
Jun. 2023 |
Anchoring Equipment |
1 Jul. 2024 |
UR M53 |
Rev.5 |
May 2023 |
Calculations for I.C. Engine Crankshafts |
1 Jul. 2024 |
UR M73 |
Rev.2 |
May 2023 |
Turbochargers |
1 Jul. 2024 |
UR Z11 |
Rev.6 |
May 2023 |
Mandatory Ship Type and Enhanced Survey Programme (ESP) Notations |
1 Jul. 2024 |
UR Z17 |
Rev.18 Corr.1 |
May 2023 |
Procedural Requirements for Service Suppliers |
--- |
UR Z23 |
Rev.7 Corr.2 |
May 2023 |
Hull Survey for New Construction |
--- |
UR S26 |
Rev.5 |
May 2023 |
Strength and Securing of Small Hatches on the Exposed Fore Deck |
1 Jul. 2024 |
UR G2 |
Rev.3 |
May 2023 |
Liquefied gas cargo tanks and process pressure vessels |
1 Jul. 2024 |
UR M72 |
Rev.3 |
Apr. 2023 |
Certification of Engine Components |
1 Jul. 2024 |
UR M56 |
Rev.4 Corr.2 |
Mar. 2023 |
Marine gears – load capacity of involute parallel axis spur and helical gears |
--- |
UR Z10.5 |
Rev.20 |
Feb. 2023 |
Hull Surveys of Double Skin Bulk Carriers |
1 Jul. 2024 |
UR Z10.4 |
Rev.18 |
Feb. 2023 |
Hull Surveys of Double Hull Oil Tankers |
1 Jul. 2024 |
UR Z10.2 |
Rev.37 |
Feb. 2023 |
Hull Surveys of Bulk Carriers |
1 Jul. 2024 |
UR Z10.1 |
Rev.25 |
Feb. 2023 |
Hull Surveys of Oil Tankers |
1 Jul. 2024 |
UR M82 |
New |
Mar. 2023 |
Type Testing Procedure of Explosion Relief Devices for Combustion Air Inlet and Exhaust Gas Manifolds of I.C. Engines Using Gas as Fuel |
Jul. 2024 |
UR W31 |
Rev.3 |
Mar. 2023 |
YP47 Steels and Brittle Crack Arrest Steels |
1 Jul. 2024 |
UR Z17 |
Rev.18 |
Feb. 2023 |
Procedural Requirements for Service Suppliers |
Jul. 2023 |
UR S10 |
Rev.7 |
Feb. 2023 |
Rudders, sole pieces and rudder horns |
1 Jul. 2024 |
UR M77 |
Rev.4 |
Feb. 2023 |
Storage and use of SCR reductants |
Jan. 2024 |
UR I3 |
Rev.2 |
Jan. 2023 |
Machinery Requirements for Polar Class Ships |
Jul. 2024 |
UR M31 |
Del. |
Jan. 2023 |
Continuity of electrical power supply for vessels with periodically unattended machinery spaces |
--- |
UR M63 |
Rev.1 |
Jan. 2023 |
Alarms and safeguards for emergency internal combustion (I.C.) engines |
Jan. 2024 |
UR S35 |
New |
Feb. 2023 |
Buckling Strength Assessment of Ship Structural Elements |
1 Jul. 2024 |
UR S21A |
Del. |
Jan. 2023 |
Evaluation of Scantlings of Hatch Covers and Hatch Coamings and Closing Arrangements of Cargo Holds of Ships |
1 Jul. 2024 |
UR S21 |
Rev.6 |
Jan. 2023 |
Evaluation of Scantlings of Hatch Covers and Hatch Coamings and Closing Arrangements of Cargo Holds of Ships |
1 Jul. 2024 |
Resolution |
Revision |
Adoption Date |
Title |
Implementation Date |
UI SC99 |
Rev.2 Corr.1 |
Sep. 2024 |
Flexible bellows of combustible materials |
--- |
UI SC211 |
Rev.1 |
Sep. 2024 |
Protection of fuel oil tanks and designation of fore peak spaces |
1 Jan. 2026 |
UI MPC131 |
New |
Jul. 2024 |
Unified Interpretation on the application of the amendments to Appendix IX of MARPOL Annex VI adopted by MEPC.385(81) |
1 Nov. 2024 |
UI SC303 |
New |
Jul. 2024 |
Harmonization of Industrial Personnel Safety Certificate with SOLAS Safety Certificates |
1 Jul. 2025 |
UI SC156 |
Rev.3 |
Jul. 2024 |
Doors in watertight bulkheads of cargo ships and passenger ships |
1 Jul. 2025 |
UI GF20 |
New |
Jun. 2024 |
Arrangements of fuel tanks in methyl/ethyl alcohol fuelled vessels |
1 Jul. 2025 |
UI SC302 |
New |
May 2024 |
Interpretation of SOLAS Regulation II-2/11.4.1 Pertaining to Crowns of Machinery Spaces of Category A
|
1 Jul. 2025 |
UI LL62 |
Rev.1 Corr.2 |
Jun. 2024 |
Side Scuttles, Windows and Skylights |
--- |
UI SC277 |
Rev.1 |
May 2024 |
Escape from machinery spaces on cargo ships |
1 Jul. 2025 |
UI SC276 |
Rev.1 |
May 2024 |
Escape from machinery spaces on passenger ships |
1 Jul. 2025 |
UI SC89 |
Rev.5 |
May 2024 |
Ventilation of Cargo Spaces |
1 Jan. 2025 |
UI SC301 |
New |
May 2024 |
SOLAS Regulations II-2/9.7.2 and 9.7.5.1 – Separation of ducts from spaces |
1 Jul. 2025 |
UI SC266 |
Del. |
Feb. 2024 |
Revised guidelines for cargo securing manual and code of safe practice for cargo stowage and securing– scope of application |
--- |
UR M83 |
New |
Oct. 2023 |
Testing of the control system of controllable pitch propellers intended for main propulsion |
1 Jan. 2025 |
UI GF19 |
New |
Dec. 2023 |
Fuel Supply to Consumers – single common flanges |
1 Jul. 2024 |
UI SC249 |
Rev.2 |
Jan. 2024 |
Implementation of SOLAS II-1, Regulation 3-5 and MSC.1/Circ.1379 |
1 Jan. 2025 |
UI MPC29 |
Rev.2 |
Dec. 2023 |
Annex VI of MARPOL 73/78 |
1 Jul. 2024 |
UI MPC12 |
Rev.3 Corr.2 |
Dec. 2023 |
Annex VI of MARPOL 73/78 |
--- |
UI SC264 |
New Corr.1 |
Dec. 2023 |
Non-combustible material as ‘steel or equivalent’ for ventilation ducts (SOLAS II-2/Reg. 9.7.1.1) |
--- |
UI SC298 |
New Corr.1 |
Nov. 2023 |
Interpretations of various Performance Standards related to GMDSS radio installations |
--- |
UI SC265 |
Del. |
Nov. 2023 |
Code of safe practice for cargo stowage and securing – Annex 14 |
--- |
UI SC212 |
Rev.1 |
Nov. 2023 |
Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels (SOLAS regulation II-1/3-8) |
1 Jan. 2024 |
UI SC120 |
Rev.2 Corr.2 |
Oct. 2023 |
Access to forecastle spaces on tankers
|
--- |
UI GC39 |
New |
Sep. 2023 |
Interpretation of 2014 IGC Code (MSC.370(93), as amended) Paragraphs 11.3.1 11.4.1, 11.4.3 and 18.10.3.2 w.r.t additional bunkering manifold equipment fitted on L.N.G. Bunkering Ships |
1 Jul. 2024 |
UI SC300 |
New |
Aug. 2023 |
Containment of fire: details of fire insulation of duct penetrations |
1 Jul. 2024 |
UI SC123 |
Rev.5 |
Jul. 2023 |
Machinery Installations - Service Tank Arrangements |
1 July 2024 |
UI GC13 |
Rev.3 |
Aug. 2023 |
Verifications before and after the first loaded voyage |
1 January 2024 |
UI SC299 |
New |
Jul. 2023 |
Watertight testing after fire testing of penetrations in watertight divisions in passenger ships |
1 Jul. 2024 |
UI GF13 |
Rev.1 |
May. 2023 |
Fire protection of spaces containing equipment for the fuel preparation |
1 Jan. 2024 |
UI MPC125 |
Rev.1 |
May. 2023 |
Technical Code on Control of Emission of Nitrogen Oxides from Marine Diesel Engines (NOx Technical Code 2008, Chapter 4, Paragraph 4.4.6.1) |
1 Jan. 2024 |
UI SC70 |
Rev.4 Corr.1 |
Apr. 2023 |
Cargo tank vent systems and selection of electrical equipment |
--- |
UI SC121 |
Rev.2 Corr.1 |
Apr. 2023 |
Fire Pump Isolation Requirements |
--- |
UI SC30 |
Rev.3 |
Mar. 2023 |
Fire-extinguishing arrangements in machinery spaces |
--- |
UI SC138 |
New Corr.1 |
Feb. 2023 |
Safe Access to Tanker Bows |
--- |
UI SC245 |
Rev.1 |
Jan. 2023 |
Suction and discharge piping of emergency fire pumps, which are run through the machinery space |
Jan. 2023 |
UI SC121 |
Rev.2 |
Jan. 2023 |
Fire Pump Isolation Requirements |
Jan. 2023 |
UI LL16 |
Rev.2 |
Jan. 2023 |
Sheer |
--- |
UI SC120 |
Rev.2 Corr.1 |
Jan. 2023 |
Access to forecastle spaces on tankers |
--- |
UI SC127 |
Rev.2 Corr.1 |
Jan. 2023 |
Paints, varnishes and other finishes |
--- |