Part CSR-T
This page contains useful information regarding ClassNK’s Rules for Common Structural Rules for Double Hull Oil Tankers (Part CSR-T) as well as IACS’ Common Structural Rules for Oil Tankers (CSR-OT).
List | |||
---|---|---|---|
Full Text of Rules (Part CSR-T 2015 edition) | |||
Corrigenda | IACS CSR for Oil Tankers 2006 | Corrigenda 1 | |
Corrigenda 2 | |||
Corrigenda 3 | |||
IACS CSR for Oil Tankers 2008 | Corrigenda 1 | ||
Rule Change | IACS CSR for Oil Tankers 2006 | Rule Change Notice No.1 | |
Rule Change Notice No.2 | |||
IACS CSR for Oil Tankers 2008 | Rule Change Notice No.1 | ||
Rule Change Notice No.2 | |||
IACS CSR for Oil Tankers 2010 | Rule Change Notice No.1 | ||
Questions, Answers and Common Interpretations | |||
CSR Commentary | Technical background documents |
Q&A for Oil Tanker CSR
List | ||
---|---|---|
New Items added in October 2013 | ZIP |
|
Q&A and Common Interpretations ( Including New Items added in October 2013 ) | ZIP | |
List (Please refer to PDF file in each section for attachments.) | ||
Section.01 | Introduction | |
Section.02 | Rule Principles | |
Section.03 | Rule Application | |
Section.04 | Basic Information | |
Section.05 | Structural Arrangement | |
Section.06 | Materials and Welding | |
Section.07 | Loads | |
Section.08 | Scantling Requirements | |
Section.09 | Design Verification | |
Section.10 | Buckling and Ultimate Strength | |
Section.11 | General Requirements | |
Section.12 | Ship in Operation Renewal Criteria | |
Appendix A | Hull Girder Ultimate Strength | |
Appendix B | Structural Strength Assessment | |
Appendix C | Fatigue Strength Assessment | |
Appendix D | Buckling Strength Assessment | |
Common Interpretation (Procedure) |
Technical Background Documents for Oil Tankers CSR
List | ||
---|---|---|
Section.01 | Introduction | |
Section.02 | Rule Principles | |
Section.03 | Rule Application | |
Section.04 | Basic Information | |
Section.05 | Structural Arrangement | |
Section.06 | Materials and Welding | |
Section.07 | Loads | |
Section.08/1 | Scantling Requirements/ Longitudinal Strength | |
Section.08/2 | Scantling Requirements/ Cargo Tank Region | |
Section.08/3 | Scantling Requirements/ Structure Forward of the Forward Cargo Tank | |
Section.08/4 | Scantling Requirements/ Machinery Space | |
Section.08/5 | Scantling Requirements/ Aft End | |
Section.08/6 | Scantling Requirements/ Evaluation of Structure for Sloshing and Impact Loads | |
Section.08/7 | Scantling Requirements/ Application of Scantling Requirements to Other Structure | |
Section.09/1 | Design Verification/ Hull Girder Ultimate Strength | |
Section.09/2 | Design Verification/ Strength Assessment (FEM) | |
Section.09/3 | Design Verification/ Fatigue Strength | |
Section.10 | Buckling and Ultimate Strength | |
Section.11 | General Requirements | |
Section.12 | Ship in Operation Renewal Criteria | |
Appendix A | Hull Girder Ultimate Strength | |
Appendix B | Structural Strength Assessment | |
Appendix C | Fatigue Strength Assessment | |
Appendix D | Buckling Strength Assessment |